Huntsman Wilton (2021-2022)

Awarded a contract Working as the principal contractor for Huntsman on the reactor refurbishment project, this project saw TRL Group carry out an engineering survey and review of the existing structure and then cover the design, detailing and fabrication of additional structural sections, site installation and all blasting and coatings, while working on a live […]

Acciona UK Ness Energy project EfW. (2021–2022)

Contract award to provide site management and manpower to erect circa 2000t of structural steelwork. Also design and detail and fabrication and supply of an addition 250T of structural steelwork. Fabrication circa 250T erection circa 2250T

Strabag Ltd – Wilton Site (2018-2019)

Contract award to oversee and manage the dismantle of a segment factory in Austria, transport and erect the structure, fabricate and provide an additional 40t of structural steelwork to enhance the structural effectiveness of the building. Circa 200T

Sirius Minerals Woodsmith Mine & Lockwood Beck

Contract award to provide consultancy, training, and development of a lifting procedures. Covering all rigging & lifting operations and acting as lifting technical authority for all lifting works on site on behalf of the client. 3-year contract.

DMC Ltd, Woodsmith and Lockwood Beck (2019-2021)

Contract award to provide management and all manpower for this project over both sites, covering erection of structural steelwork, onsite fabrication works, installation of winches, machinery, and sub level Galloway structures. Circa 5000T.

MGT / APC – MGT Tees Rep Biomass Project

Contract award to provide management manpower and supervision to erect circa 2000 of the structural steel works for the boiler house. Including the 180T header vessel